top of page

Irwin Creek Tributary Basin Capacity Study

Irwin Creek Tributary to Remount Road basin is situated in the City of Charlotte South End district. Notably, this area has experienced a surge in development due to the proximity of the light rail system. As a consequence of the substantial increase in Transit Oriented Development zoning, the existing infrastructure, dating back to the 1940s-1960s, is facing heightened strain.

The main objective of this project was to conduct a comprehensive assessment of the current sewer system and identify areas where upsizing is imperative to accommodate the projected growth in the region. KEA (Formally TKG) played a supporting role to STV in evaluating potential alternative routes for the sewer system, taking into consideration the requirements for future development while also balancing factors like constructability and maintenance operations. 

Role

Consultant

Services

Engineering

QA/QC

North Trunk Alt Route #2.png

Copyright © 2025 | KEA

bottom of page